-> Zawia Derna Sussa - Libya

Engineering, procurement, construction and commissioning of 8 desalination units, 20,000 m3/day (160,000 m3/day in total) as follows: 4 units at Zawia, 2 at Derna and 2 at Sussa. The projects also include the supply and installation of auxiliary boilers, sea water pumps, potabilisation plants and 2 x 80,000 m3/day  sea water intake lines at Derna and Sussa.

Owner:  General People's Committee of Electricity Water & Gas

Site:  Zawia, Derna & Sussa, Libya

Contract Award: 2006

Completition date: 2009

Contract type: Lump sum turnkey

Process type: MED-TVC

-> Layyah D12/D13 - United Arab Emirates (Sharjah)

Engineering, procurement, construction and commissioning of 2 units of 8 MIGD each (17 million gallons daily production) complete with potabilisation plant and ancillary equipment.

Owner: Sharjah Electricity & Water Authority

Site: Layyah, Emirate of Sharjah

Contract Award: 1 unit in 2005, 1 in 2006

Completion date: 2006 & 2007

Contract type: Lump sum turn key

Process: MED-TVC

 

-> Abutaraba - Lybia

Engineering, procurement, construction and commissioning of 3 units of 13,333 m3/day each (40,000 m3/day in total) complete with auxiliary boilers, sea water intake, remineralisation plant and ancillary equipment.

Owner: GECOL

Site: Abutaraba, Libya

Contract Award: 2004

Completion date: 2006

Contract type: Lump sum turn key

Process: MED-TVC

 

-> Ras Al Khaimah / Ajman - United Arab Emirates

Engineering, procurement, construction and commissioning of 2 units at RAK and 1 unit at Ajman of 22,730 m3/day each.

Client: Federal Electricity & Water Authority

Site: Ras Al Khaimah and Ajman

Contract Award: 2003

Completion date: 2005

Contract type: Lump sum turn key

Process: MED-TVC

 

-> Al Taweelah A1 - United Arab Emirates (Abu Dhabi)

Engineering, procurement, construction and commissioning of 14 units of 3.77 MIGD each (53 MIGD or 240,000 m3/day) together with ancillary equipment.

Client: Total Tractebel EPCC Co.

Site: Al Taweelah, Emirate of Abu Dhabi

Contract Award: 2000

Completion date: 2002

Contract type: Lump sum turn key

Process: MED-TVC

 

-> Layyah D10/D11 - United Arab Emirates (Sharjah)

Engineering, procurement, construction and commissioning of 2 units of 22,850 m3/day each (45,700 m3/day total) complete with ancillary equipment.

Client: Total Tractebel EPCC Co.

End User: Abu Dhabi Water & Electricity Authority

Site: Al Taweelah, UAE

Contract Award: 2000

Completion date: 2002

Contract type: Lump sum turn key

Process: MED-TVC

 

-> Umm Al Naar West - Abu Dhabi

Engineering, procurement, construction and commissioning of 2 units of 16,000 m3/day each (32,000 m3/day total) together with ancillary equipment.

Client: Abu Dhabi Water & Electricity Authority

Site: Umm Al Naar, UAE

Contract Award: 1998

Completion date: 2000

Contract type: Lump sum turn key

Process: MED-TVC

 

-> Tobruk - Libya

MED-TVC - 3 units of 13,333 m3/day (40,000 cubic meters daily production)

Client: General Electric Company of Libya

Site: Tobruk, Libya

Contract Award: 1997

Completion date: 2000

Contract type: Lump sum turn key

Process: MED-TVC

 

-> Al Ghalilah - Oman

Engineering, procurement and commissioning of 2 units of 500 m3/day each. The steam used in the MED process is obtained by mechanical compression of the vapour.

Client: Chiyoda - Foster Wheeler

End User: Oman LNG

Site: Al Ghalilah, Oman

Contract Award: 1997

Completion date: 1999

Contract type: Lump sum E&P

Process: MED-MVC

 

-> Priolo Gargallo - Italy

Engineering and commssioning of 2 units of 7,200 m3/day each (14,400 m3/day total). Procurement, construction by mother company Technipetrol.

Client: Technipetrol

End User: ISAB Energy srl

Site: Priolo Gargallo, Sicily

Contract Award: 1996

Completion date: 1998

Contract type: Lump sum Engineering only

Process: MED

 

-> Jebel Dhanna - United Arab Emirates (Abu Dhabi)

Engineering, procurement, construction and commissioning of 2 units of 9,090 m3/day each (18,180 m3/day in total).

Client: Water & Electricity Department

Site: Jebel Dhanna, Emirate of Abu Dhabi

Contract Award: 1994

Completion date: 1996

Contract type: Lump sum turn key

Process: MED-TVC

 

-> Curaçao - Netherland Antilles

Engineering, procurement, construction and commissioning of 1 unit of 12,000 m3/day. The unit is based on the MED process and can work with or without thermocompressor. The GOR of the unit is 14.

Client: Kompania di Awa i Elektrisidat

Site: Curaçao Island

Contract Award: 1994

Completion date: 1997

Contract type: Lump sum turn key

Process: MED / MED-TVC

 

-> Al Taweelah A - United Arab Emirates (Abu Dhabi)

Engineering, procurement, construction and commissioning of 3 units of 33,333 m3/day each (100,000 m3/day in total) in 1982-1986 and 1 additional unit of 35,000 m3/day in 1991-1994. The 4 units are based on the MSF with brine recirculation principle.

Client: Water & Electricity Department

Site: Al Taweelah, Emirate of Abu Dhabi

Contract Award: 3 units in 1982, 1 in 1991

Completion date: 1986 (3 units) & 1994 (1 unit)

Contract type: Lump sum turn key

Process: MSF-BR

 

-> Trapani - Italy

Engineering and commissioning of 2 units of 9,000 m3/day each (18,000 m3/day total). Procurement and construction by mother company Technipetrol.

Client: Technipetrol

End User: Trapani Municipality

Site: Trapani, Sicily

Contract Award: 1989

Completion date: 1992

Contract type: Lump sum engineering only

Process: MED-TVC

 

-> Pantelleria - Italy

Engineering and commissioning of 2 units of 1,600 m3/day each (3,200 m3/day total). The procurement and construction activities were performed by mother company Technipetrol. The units operate with steam obtained by mechanical compression of the vapour.

Client: Technipetrol

End User: Cassa per il Mezzogiorno

Site: Pantelleria

Contract Award: 1986

Completion date: 1989

Contract type: Lump sum engineering

Process: MED-MVC

 

-> Umm Al Naar West & East - United Arab Emirates (Abu Dhabi)

Engineering, procurement, construction and commissioning of 3 units of 27,500 m3/day each at Umm Al Naar East in 1976-1979, and 4 additional units of same capacity at Umm Al Naar West in 1980-1987. The total installed capacity at both sides is 192,500 m3/day. The uniis are based on the MSF with brine recirculation process.

Client: Water & Electricity Department

Site: Umm Al Naar, Emirate of Abu Dhabi

Contract Award: 3 units in 1976, 4 in 1980

Completion dates: 1979 (3 units) & 1987 (4 units)

Contract type: Lump sum turn key

Process: MSF-BR

 

-> Al Khobar 2 - Saudi Arabia

Engineering, procurement, construction and commissioning of 10 units of 26,700 m3/day each (267,000 m3/day in total). The units are based on the MSF with brine recirculation process.

Client: Saline Water Conversion Corporation

Site: Al-Khobar

Contract Award: 1979

Completion date: 1982

Contract type: Lump sum turn key

Process: MSF-BR

 

-> Abu Dhabi 1

Engineering, procurement, construction and commissioning of 4 units of 15,000 m3/day each (60,000 cubic meters total daily production). The units operate under the MSF with brine recirculation process.

Client: Water & Electricity Department

Site: Abu Dhabi

Contract Award: 1974

Completion date: NA

Contract type: Lump sum turn key

Process: MSF-BR