-> Zawia Derna Sussa - Libya
Engineering, procurement, construction and commissioning of 8 desalination units, 20,000 m3/day (160,000 m3/day in total) as follows: 4 units at Zawia, 2 at Derna and 2 at Sussa. The projects also include the supply and installation of auxiliary boilers, sea water pumps, potabilisation plants and 2 x 80,000 m3/day sea water intake lines at Derna and Sussa.
Owner: General People's Committee of Electricity Water & Gas
Site: Zawia, Derna & Sussa, Libya
Contract Award: 2006
Completition date: 2009
Contract type: Lump sum turnkey
Process type: MED-TVC
-> Layyah D12/D13 - United Arab Emirates (Sharjah)
Engineering, procurement, construction and commissioning of 2 units of 8 MIGD each (17 million gallons daily production) complete with potabilisation plant and ancillary equipment.
Owner: Sharjah Electricity & Water Authority
Site: Layyah, Emirate of Sharjah
Contract Award: 1 unit in 2005, 1 in 2006
Completion date: 2006 & 2007
Contract type: Lump sum turn key
Process: MED-TVC
-> Abutaraba - Lybia
Engineering, procurement, construction and commissioning of 3 units of 13,333 m3/day each (40,000 m3/day in total) complete with auxiliary boilers, sea water intake, remineralisation plant and ancillary equipment.
Owner: GECOL
Site: Abutaraba, Libya
Contract Award: 2004
Completion date: 2006
Contract type: Lump sum turn key
Process: MED-TVC
-> Ras Al Khaimah / Ajman - United Arab Emirates
Engineering, procurement, construction and commissioning of 2 units at RAK and 1 unit at Ajman of 22,730 m3/day each.
Client: Federal Electricity & Water Authority
Site: Ras Al Khaimah and Ajman
Contract Award: 2003
Completion date: 2005
Contract type: Lump sum turn key
Process: MED-TVC
-> Al Taweelah A1 - United Arab Emirates (Abu Dhabi)
Engineering, procurement, construction and commissioning of 14 units of 3.77 MIGD each (53 MIGD or 240,000 m3/day) together with ancillary equipment.
Client: Total Tractebel EPCC Co.
Site: Al Taweelah, Emirate of Abu Dhabi
Contract Award: 2000
Completion date: 2002
Contract type: Lump sum turn key
Process: MED-TVC
-> Layyah D10/D11 - United Arab Emirates (Sharjah)
Engineering, procurement, construction and commissioning of 2 units of 22,850 m3/day each (45,700 m3/day total) complete with ancillary equipment.
Client: Total Tractebel EPCC Co.
End User: Abu Dhabi Water & Electricity Authority
Site: Al Taweelah, UAE
Contract Award: 2000
Completion date: 2002
Contract type: Lump sum turn key
Process: MED-TVC
-> Umm Al Naar West - Abu Dhabi
Engineering, procurement, construction and commissioning of 2 units of 16,000 m3/day each (32,000 m3/day total) together with ancillary equipment.
Client: Abu Dhabi Water & Electricity Authority
Site: Umm Al Naar, UAE
Contract Award: 1998
Completion date: 2000
Contract type: Lump sum turn key
Process: MED-TVC
-> Tobruk - Libya
MED-TVC - 3 units of 13,333 m3/day (40,000 cubic meters daily production)
Client: General Electric Company of Libya
Site: Tobruk, Libya
Contract Award: 1997
Completion date: 2000
Contract type: Lump sum turn key
Process: MED-TVC
-> Al Ghalilah - Oman
Engineering, procurement and commissioning of 2 units of 500 m3/day each. The steam used in the MED process is obtained by mechanical compression of the vapour.
Client: Chiyoda - Foster Wheeler
End User: Oman LNG
Site: Al Ghalilah, Oman
Contract Award: 1997
Completion date: 1999
Contract type: Lump sum E&P
Process: MED-MVC
-> Priolo Gargallo - Italy
Engineering and commssioning of 2 units of 7,200 m3/day each (14,400 m3/day total). Procurement, construction by mother company Technipetrol.
Client: Technipetrol
End User: ISAB Energy srl
Site: Priolo Gargallo, Sicily
Contract Award: 1996
Completion date: 1998
Contract type: Lump sum Engineering only
Process: MED
-> Jebel Dhanna - United Arab Emirates (Abu Dhabi)
Engineering, procurement, construction and commissioning of 2 units of 9,090 m3/day each (18,180 m3/day in total).
Client: Water & Electricity Department
Site: Jebel Dhanna, Emirate of Abu Dhabi
Contract Award: 1994
Completion date: 1996
Contract type: Lump sum turn key
Process: MED-TVC
-> Curaçao - Netherland Antilles
Engineering, procurement, construction and commissioning of 1 unit of 12,000 m3/day. The unit is based on the MED process and can work with or without thermocompressor. The GOR of the unit is 14.
Client: Kompania di Awa i Elektrisidat
Site: Curaçao Island
Contract Award: 1994
Completion date: 1997
Contract type: Lump sum turn key
Process: MED / MED-TVC
-> Al Taweelah A - United Arab Emirates (Abu Dhabi)
Engineering, procurement, construction and commissioning of 3 units of 33,333 m3/day each (100,000 m3/day in total) in 1982-1986 and 1 additional unit of 35,000 m3/day in 1991-1994. The 4 units are based on the MSF with brine recirculation principle.
Client: Water & Electricity Department
Site: Al Taweelah, Emirate of Abu Dhabi
Contract Award: 3 units in 1982, 1 in 1991
Completion date: 1986 (3 units) & 1994 (1 unit)
Contract type: Lump sum turn key
Process: MSF-BR
-> Trapani - Italy
Engineering and commissioning of 2 units of 9,000 m3/day each (18,000 m3/day total). Procurement and construction by mother company Technipetrol.
Client: Technipetrol
End User: Trapani Municipality
Site: Trapani, Sicily
Contract Award: 1989
Completion date: 1992
Contract type: Lump sum engineering only
Process: MED-TVC
-> Pantelleria - Italy
Engineering and commissioning of 2 units of 1,600 m3/day each (3,200 m3/day total). The procurement and construction activities were performed by mother company Technipetrol. The units operate with steam obtained by mechanical compression of the vapour.
Client: Technipetrol
End User: Cassa per il Mezzogiorno
Site: Pantelleria
Contract Award: 1986
Completion date: 1989
Contract type: Lump sum engineering
Process: MED-MVC
-> Umm Al Naar West & East - United Arab Emirates (Abu Dhabi)
Engineering, procurement, construction and commissioning of 3 units of 27,500 m3/day each at Umm Al Naar East in 1976-1979, and 4 additional units of same capacity at Umm Al Naar West in 1980-1987. The total installed capacity at both sides is 192,500 m3/day. The uniis are based on the MSF with brine recirculation process.
Client: Water & Electricity Department
Site: Umm Al Naar, Emirate of Abu Dhabi
Contract Award: 3 units in 1976, 4 in 1980
Completion dates: 1979 (3 units) & 1987 (4 units)
Contract type: Lump sum turn key
Process: MSF-BR
-> Al Khobar 2 - Saudi Arabia
Engineering, procurement, construction and commissioning of 10 units of 26,700 m3/day each (267,000 m3/day in total). The units are based on the MSF with brine recirculation process.
Client: Saline Water Conversion Corporation
Site: Al-Khobar
Contract Award: 1979
Completion date: 1982
Contract type: Lump sum turn key
Process: MSF-BR
-> Abu Dhabi 1
Engineering, procurement, construction and commissioning of 4 units of 15,000 m3/day each (60,000 cubic meters total daily production). The units operate under the MSF with brine recirculation process.
Client: Water & Electricity Department
Site: Abu Dhabi
Contract Award: 1974
Completion date: NA
Contract type: Lump sum turn key
Process: MSF-BR